China Factory Setup Project Cases and Overseas References

China and overseas project references across new facilities, existing plant upgrades and supporting infrastructure.

English web edition · 18 September 2026

Explore China Factory Setup Project Cases

Our portfolio covers manufacturing facilities, plant upgrades and associated infrastructure. Read each case for its process, facility route, utilities and investment assumptions, then identify the comparable requirements in your own China factory setup project.

Project identities are anonymized. Figures and schedules are planned or estimated values from the relevant reports, not construction quotations or evidence of completion, approval or operating performance. Some references concern energy conservation, utilities, storage or agricultural facilities rather than a new standalone factory. Each entry retains that distinction.

RMB denotes Chinese yuan; USD denotes US dollars. One mu is approximately 666.67 m². Tonnes are metric. Report periods are project assumptions and are not promised delivery periods for a new engagement.

China Factory Project Cases

China reference 01 · Electronics and intelligent manufacturing

Technology Industrial Park Phase I in East China

A planned industrial park in Jiangsu on approximately 22 mu of land, with approximately 35,100 m² of low-carbon factory buildings and R&D and office space, combining manufacturing and research functions.

Development approach
New factory buildings for Phase I of an industrial park.
Key facilities
Low-carbon factory buildings, R&D and office space, parking and ancillary facilities.
Key site requirements
Industrial land in Suzhou, Jiangsu; coordinated provision for manufacturing workshops and R&D offices.
Planned investment and schedule
Total investment: RMB 125 million. Construction period: 3 years.
Comparable applications
Electronics industrial parks; R&D and manufacturing bases; low-carbon standard factory buildings.

China reference 02 · Semiconductors and electronic equipment

Semiconductor Cleaning Equipment Manufacturing Base in East China

Planned use of approximately 35,100 m² of factory, R&D and office space in Jiangsu for semiconductor cleaning equipment production, with capacity for approximately 200 cleaning, wet-etching and related machines per year.

Development approach
Lease of factory premises in an industrial park and installation of production lines.
Key facilities
Automated semiconductor cleaning equipment production line, R&D offices and testing areas.
Key site requirements
Existing factory premises in Suzhou, Jiangsu; suitability for equipment installation and clean production.
Planned investment and schedule
Total investment: RMB 80.8815 million. Construction period: 2 years.
Comparable applications
Semiconductor equipment factories; wet-process equipment production bases; precision equipment manufacturing.

China reference 03 · Advanced materials and resource recycling

Recycled Graphite Materials Production in Northwest China

Planned recycled graphite processing facilities in Ningxia on approximately 20 mu of land, with approximately 11,500 m² of buildings and dedicated raw material, production, finished goods and testing areas.

Development approach
Construction or conversion of facilities for recycled material production.
Key facilities
Raw material, production, finished goods and laboratory testing areas.
Key site requirements
Industrial land in Ningxia; provision for feedstock collection, processing and finished goods transport.
Planned investment and schedule
Total investment: RMB 70 million. Construction period: approximately 1 year.
Comparable applications
Recycled graphite factories; carbon material production bases; higher-value utilization of industrial solid waste.

China reference 04 · Additive manufacturing and advanced materials

Industrial Park for Recycled 3D Printing Materials in South China

A planned park in Guangxi on approximately 137.87 mu, with approximately 73,200 m² of buildings for main workshops, R&D offices, logistics, finished goods and utilities.

Development approach
New industrial park for recycled 3D printing materials.
Key facilities
Main workshops, finished goods and logistics areas, research offices and wastewater treatment facilities.
Key site requirements
Hezhou, Guangxi; integrated planning of production, logistics and utilities.
Planned investment and schedule
Total investment: RMB 260 million.
Comparable applications
Additive manufacturing parks; 3D printing material factories; recycled material processing bases.

China reference 05 · Semiconductors and electronic equipment

Semiconductor Epitaxy Equipment R&D and Industrialization in North China

A planned multipurpose production building in Beijing, with MOCVD equipment assembly lines and R&D facilities to support commercial manufacturing of high-precision epitaxial growth equipment.

Development approach
New production building and assembly lines.
Key facilities
Metal-organic chemical vapor deposition (MOCVD) equipment assembly lines, R&D areas and equipment commissioning space.
Key site requirements
Shunyi Comprehensive Bonded Zone, Beijing; conditions suitable for precision equipment R&D and manufacturing.
Planned investment and schedule
Total investment: RMB 483 million. Total Phase I construction period: 26 months.
Comparable applications
MOCVD equipment factories; semiconductor equipment industrialization; advanced equipment R&D and manufacturing bases.

China reference 06 · Cold chain equipment and logistics facilities

Cold Chain Equipment R&D and Manufacturing Base Phase I in North China

A planned development in Hebei on approximately 31,800 m² of land, with approximately 17,600 m² of R&D workshop space, pilot production lines for cold chain equipment, experimental platforms and utilities.

Development approach
New R&D workshop buildings and pilot production lines.
Key facilities
Two R&D workshop buildings, experimental platforms and a cold chain equipment pilot line.
Key site requirements
Zhangjiakou Economic Development Zone, Hebei; suitable buildings, utilities and cold chain testing conditions.
Planned investment and schedule
Total investment: RMB 150 million. Construction period: approximately 2 years.
Comparable applications
Refrigeration equipment factories; cold chain equipment R&D and manufacturing bases; equipment production for cold storage facilities.

China reference 07 · Semiconductor industry infrastructure

Standard Factory Buildings and Energy Infrastructure for the IC Industry in North China

Planned standard factory buildings, R&D buildings and connecting corridors in Beijing for integrated circuit (IC) equipment and component manufacturers, supported by heating and energy station facilities.

Development approach
New standard factory buildings for the IC industry and associated energy infrastructure.
Key facilities
R&D buildings, standard factory buildings, connecting corridors, an energy station and heating systems.
Key site requirements
Beijing Economic-Technological Development Area; reliable energy supply and the specific requirements of IC manufacturing premises.
Planned investment and schedule
Factory building project: approximately RMB 386 million. Associated heating project: approximately RMB 4.64 million.
Comparable applications
Standard factory buildings for the IC industry; semiconductor industrial parks; energy infrastructure for cleanroom facilities.

China reference 08 · Pharmaceutical manufacturing

Intelligent Softgel Production Line

Review of production equipment, utilities and energy requirements for a softgel production line and its energy-saving scheme. The underlying document is an energy conservation report and does not independently establish that new factory buildings are proposed.

Development approach
Production line development and energy provision within an existing pharmaceutical plant.
Key facilities
Intelligent softgel production line and associated utilities.
Key site requirements
An existing pharmaceutical site; workshop compatibility and energy supply are the principal considerations.
Comparable applications
Pharmaceutical dosage-form production lines; softgel workshop conversions; energy efficiency upgrades at pharmaceutical factories.

China reference 09 · Food and biomanufacturing

Alternative Protein Industrial Base in East China

A planned industrial base in Shanghai on approximately 50 mu, integrating production, R&D and ancillary facilities for alternative protein products.

Development approach
New alternative protein industrial base.
Key facilities
Food production, R&D and ancillary facilities.
Key site requirements
Planned site in Jinshan, Shanghai; coordinated food production, R&D and logistics requirements.
Planned investment and schedule
Total investment: approximately RMB 475 million. Construction period: approximately 1 year.
Comparable applications
Alternative protein factories; plant-based protein food production bases; innovative food industrial parks.

China reference 10 · Environmental equipment and advanced materials

Air Purification Equipment and Environmental Material Production Base in South China

Planned Phase I of a production base in Guangdong for air purification equipment and new environmental materials, including production space, equipment and supporting facilities.

Development approach
New Phase I production base.
Key facilities
Air purification equipment and environmental material production areas and associated infrastructure.
Key site requirements
Industrial land in Guangdong; coordination of equipment manufacturing, material production and environmental facilities.
Planned investment and schedule
Phase I investment: approximately RMB 123 million. Expected construction period: 3 years.
Comparable applications
Air purification equipment factories; environmental material production bases; environmental equipment industrial parks.

China reference 11 · New energy and energy storage

Energy Storage Battery Pack Production in East China

A planned environmentally oriented energy storage battery pack project in Shandong, covering manufacturing, assembly, testing and ancillary facilities.

Development approach
Leased factory premises with phased installation of production lines.
Key facilities
Energy storage battery pack production lines, testing facilities, offices and staff amenities.
Key site requirements
Existing factory premises in Dongying, Shandong; checks on power supply, fire safety and equipment installation conditions.
Planned investment and schedule
Overall investment: RMB 300 million. Phase I: approximately RMB 79.8259 million, with a 5-month construction period.
Comparable applications
Energy storage battery pack factories; battery system integration bases; new energy equipment manufacturing.

China reference 12 · Intelligent equipment

Industrial Robot R&D and Industrialization

Study of the R&D, assembly, manufacturing and operating premises required to develop industrial robots and bring them into commercial production.

Development approach
Development of premises for robot R&D and industrialization.
Key facilities
R&D, assembly and product testing areas.
Key site requirements
Integration of R&D and manufacturing, and suitable equipment assembly conditions.
Planned investment and schedule
Total investment: RMB 50 million.
Comparable applications
Industrial robot factories; intelligent equipment manufacturing bases; robot assembly centers.

China reference 13 · Food and agricultural processing

Agri-Food Technology R&D and Manufacturing Headquarters in East China

A planned agri-food technology R&D headquarters and industrial base integrating research, manufacturing, offices and supporting functions.

Development approach
New R&D headquarters and agri-food technology base.
Key facilities
R&D platform, manufacturing center, supply chain center and intelligent central kitchen.
Key site requirements
Approximately 85 mu of planned land; combined requirements for food production, R&D and cold chain distribution.
Planned investment and schedule
Total investment: approximately RMB 1.013 billion. Construction period: 24 months.
Comparable applications
Agri-food technology bases; food R&D and manufacturing headquarters; agricultural processing industrial parks.

China reference 14 · Mining and resource recycling

Integrated Utilization of Lead Zinc and Silver Tailings in Northern China

Planned tailings resource recovery facilities in Inner Mongolia, with areas for raw material treatment, processing and environmental infrastructure.

Development approach
Development of tailings resource recovery facilities.
Key facilities
Tailings treatment, production and processing, and environmental facilities.
Key site requirements
A mining area in Inner Mongolia; availability of tailings, transport access and environmental conditions.
Planned investment and schedule
Total investment: approximately RMB 24.9639 million. Construction period: approximately 3 months.
Comparable applications
Tailings utilization plants; non-ferrous metal solid waste treatment bases; mining resource recycling projects.

China reference 15 · Pharmaceutical manufacturing

Equipment Renewal in a Traditional Chinese Medicine Pill Workshop in North China

Replacement of secondary packaging equipment in an existing traditional Chinese medicine small-pill workshop, representing an upgrade within an operating pharmaceutical factory.

Development approach
Equipment renewal within an existing workshop.
Key facilities
Pill secondary packaging equipment and associated installation and commissioning provisions.
Key site requirements
An existing pharmaceutical factory; integration of new equipment with the workshop and production process.
Planned investment and schedule
Total investment: RMB 3.5 million. Construction period: 7 months.
Comparable applications
Traditional Chinese medicine formulation workshop upgrades; pill packaging lines; pharmaceutical factory equipment renewal.

China reference 16 · Pharmaceutical manufacturing

Pharmaceutical Granule Packaging Line in North China

A planned sachet packaging line for pharmaceutical granules within an existing plant, including packaging equipment and workshop facilities.

Development approach
Packaging line installation within an existing factory.
Key facilities
Granule sachet packaging equipment and workshop facilities.
Key site requirements
An existing pharmaceutical factory; coordination between removal of old equipment and trial operation of the new line.
Planned investment and schedule
Investment: RMB 2.6 million. Construction period: 8 months.
Comparable applications
Pharmaceutical granule packaging lines; intelligent pharmaceutical workshop upgrades; pharmaceutical packaging bases.

China reference 17 · Semiconductors and electronic equipment

IC Transfer Equipment Industrialization in North China

Planned premises and production equipment for the industrialization of IC transfer equipment. Feasibility and energy conservation documents for the same project are presented as one case.

Development approach
Development of manufacturing facilities for IC transfer equipment.
Key facilities
Precision equipment manufacturing and assembly facilities, with associated energy efficiency measures.
Key site requirements
Beijing; suitable factory premises and energy supply for precision equipment manufacturing.
Planned investment and schedule
Total investment: approximately RMB 328 million.
Comparable applications
IC transfer equipment factories; semiconductor equipment manufacturing bases; precision equipment industrialization.

China reference 18 · Pharmaceutical manufacturing

Smart Packaging Upgrade for Calcium Supplement Formulations in North China

Upgrade of an intelligent granule formulation packaging line in an existing pharmaceutical factory, including packaging equipment and associated production facilities.

Development approach
Smart packaging line upgrade within an existing pharmaceutical plant.
Key facilities
Granule formulation packaging equipment and workshop facilities.
Key site requirements
An existing pharmaceutical factory; production line integration and suitable pharmaceutical manufacturing conditions.
Planned investment and schedule
Total investment: RMB 19 million. Construction period: 1 year.
Comparable applications
Pharmaceutical packaging line upgrades; granule formulation workshop conversions; intelligent pharmaceutical factories.

China reference 19 · Grain processing and storage

Grain Storage Facilities in East China

Planned grain storage facilities and multistorey warehouses in the Yangtze River Delta, supporting storage, stock turnover and site infrastructure. Two report versions have been consolidated into one case.

Development approach
New grain storage facilities.
Key facilities
Multistorey warehouses, loading and unloading facilities, and storage and transport infrastructure.
Key site requirements
Yangtze River Delta; grain transport, warehouse turnover and moisture protection requirements.
Planned investment and schedule
Construction investment: approximately RMB 371 million.
Comparable applications
Grain storage bases; multistorey grain warehouses; warehouse infrastructure for agricultural processing parks.

China reference 20 · Pharmaceutical manufacturing

Integrated Preprocessing Line for Traditional Chinese Medicinal Materials in North China

An integrated preprocessing line for root and rhizome medicinal materials within an existing pharmaceutical factory, linking raw material treatment, production and workshop facilities.

Development approach
Upgrade of a preprocessing line in an existing traditional Chinese medicine plant.
Key facilities
Integrated root and rhizome preprocessing line and installation and commissioning space.
Key site requirements
An existing pharmaceutical factory; integration of raw material treatment with downstream processes.
Planned investment and schedule
Investment: approximately RMB 3.9 million. The construction period is not shown because the report contains inconsistent statements.
Comparable applications
Traditional Chinese medicine preprocessing workshops; medicinal material processing lines; pharmaceutical factory upgrades.

China reference 21 · Pharmaceutical manufacturing

Traditional Chinese Medicine Pill Production Line in North China

A planned small-pill production line within an existing multipurpose pharmaceutical building, involving installation of a new line in an existing structure.

Development approach
New production line within an existing building.
Key facilities
Small-pill production equipment and workshop alterations.
Key site requirements
An existing multipurpose building; verification of floor load capacity and process flows.
Planned investment and schedule
Construction period: approximately 1 year.
Comparable applications
Traditional Chinese medicine pill lines; in-plant pharmaceutical production line conversions; proprietary Chinese medicine workshops.

China reference 22 · Pharmaceutical manufacturing

Green and Intelligent Pharmaceutical Factory Pilot in North China

A pilot upgrade of an existing pharmaceutical factory, integrating production systems, energy efficiency improvements and digitalization.

Development approach
Green and intelligent upgrading of an existing pharmaceutical plant.
Key facilities
Digital production systems, energy-saving systems and workshop infrastructure.
Key site requirements
An existing pharmaceutical factory; coordination of upgrades while maintaining production continuity.
Planned investment and schedule
Investment: approximately RMB 7 million.
Comparable applications
Green pharmaceutical factories; intelligent pharmaceutical workshops; pharmaceutical plant energy efficiency retrofits.

China reference 23 · Building materials manufacturing

Ready-Mixed Concrete Batching Plant

A planned ready-mixed concrete batching plant with associated production, storage, transport and environmental facilities.

Development approach
New ready-mixed concrete batching plant.
Key facilities
Mixing equipment, aggregate storage and handling facilities, and dust control systems.
Key site requirements
Aggregate supply transport, concrete delivery access and environmental separation distances.
Planned investment and schedule
Total investment: approximately RMB 28.6142 million.
Comparable applications
Ready-mixed concrete batching plants; concrete factories; building material production bases.

China reference 24 · Additive manufacturing and advanced materials

Additive Manufacturing Production Base

A planned additive manufacturing base with 3D printing production space, equipment and ancillary facilities.

Development approach
New additive manufacturing production base.
Key facilities
3D printing equipment, factory buildings and auxiliary facilities.
Key site requirements
Suitable equipment installation conditions, material supply and finished goods transport.
Planned investment and schedule
Total investment: RMB 350 million.
Comparable applications
Additive manufacturing factories; 3D printed product production bases; digital manufacturing parks.

China reference 25 · Energy and utilities

Biomass Boiler Conversion at a Heating Plant in Northeast China

Planned conversion of eight existing coal-fired boilers to biomass at a heating plant in Heilongjiang, together with building and ancillary facility alterations. This is a redevelopment of an existing site.

Development approach
Acquisition of an existing plant followed by boiler and building conversions.
Key facilities
Conversion of eight boilers, building alterations and heating network infrastructure.
Key site requirements
An existing heating plant in Daqing, Heilongjiang; fuel supply and the heat service area.
Planned investment and schedule
Total investment: approximately RMB 541 million. Construction period: 13 months.
Comparable applications
Biomass heating plant conversions; industrial boiler renewal; energy station development.

China reference 26 · Agricultural processing

Soybean Processing and Storage Logistics

Planned soybean processing facilities and associated warehousing and logistics, linking raw material receipt, processing and finished goods storage and transport.

Development approach
Development of soybean processing and storage facilities.
Key facilities
Raw material receiving, processing and finished goods warehousing facilities.
Key site requirements
Soybean aggregation and distribution, process energy demand and transport access.
Comparable applications
Soybean processing plants; grain and edible oil processing bases; agricultural product warehousing and logistics parks.

China reference 27 · Mining equipment and intelligent manufacturing

Intelligent Mining Support Equipment Factory in Northwest China

A planned intelligent mining support equipment factory in Ningxia, covering equipment production, automation and site infrastructure.

Development approach
Development of an intelligent mining support equipment factory.
Key facilities
Equipment manufacturing facilities, automation equipment and site infrastructure.
Key site requirements
Ningxia; suitability for large equipment production, transport and energy supply.
Planned investment and schedule
Total investment: approximately RMB 1.084 billion.
Comparable applications
Mining support equipment factories; intelligent coal mining machinery factories; mining equipment manufacturing bases.

China reference 28 · Biopesticides and chemicals

High-Efficiency Biopesticide Formulation Production

Planned production of 34,000 tonnes of high-efficiency biopesticide formulations per year, with formulation manufacturing and ancillary facilities.

Development approach
New biopesticide formulation production facilities.
Key facilities
Formulation production, storage and transport, and environmental and safety facilities.
Key site requirements
Chemical park admission requirements, environmental conditions and hazardous material management.
Planned investment and schedule
Total investment: RMB 1 billion. Construction period: 24 months.
Comparable applications
Biopesticide formulation factories; agrochemical formulation production bases; fine chemical plants.

China reference 29 · Non-ferrous metals and advanced materials

Gallium Metal Production

Planned production of 60 tonnes of gallium metal per year, covering metal extraction, processing and associated production facilities.

Development approach
New gallium metal production facilities.
Key facilities
Metal extraction and processing equipment and utilities.
Key site requirements
Feedstock availability, energy supply and environmental conditions.
Planned investment and schedule
Total investment: RMB 80 million. Construction period: 12 months.
Comparable applications
Gallium metal factories; rare and dispersed metal production bases; non-ferrous material processing projects.

China reference 30 · Environmental equipment

Intelligent Upgrade of Environmental Equipment Manufacturing

An intelligent upgrade targeting annual output of 70,000 sets of environmental equipment, focused on equipment and process renewal within an existing factory.

Development approach
Intelligent upgrading of existing environmental equipment manufacturing premises.
Key facilities
Intelligent production lines, factory alterations and an intermediate warehouse.
Key site requirements
Approximately 10,000 m² of existing factory space; production line conversion and material handling requirements.
Planned investment and schedule
Total investment: approximately RMB 185 million. Construction period: 16 months.
Comparable applications
Environmental equipment factory conversions; intelligent environmental equipment manufacturing; industrial equipment production line upgrades.

China reference 31 · Non-ferrous metals and resource recycling

Integrated Utilization of Copper and Nickel Smelting Slag

Planned integrated solid waste utilization facilities with capacity to process 6 million tonnes of smelting slag per year, including 1.8 million tonnes per year in Phase I.

Development approach
Phased development of smelting slag treatment facilities.
Key facilities
Slag receiving and treatment facilities and integrated solid waste utilization lines.
Key site requirements
Proximity to smelting slag sources; verification of transport, land and environmental conditions.
Planned investment and schedule
Total investment: RMB 650 million. Construction period: 24 months.
Comparable applications
Copper and nickel smelting slag treatment plants; industrial solid waste recovery bases; non-ferrous metal recycling projects.

China reference 32 · Automotive components

New Energy Vehicle Component Assembly Base

A planned new energy vehicle component assembly project, integrating assembly lines, warehousing and production support facilities.

Development approach
New assembly facilities for new energy vehicle components.
Key facilities
Component assembly lines, warehousing and testing facilities.
Key site requirements
Automotive supply chain connections and finished goods distribution access.
Planned investment and schedule
Total investment: approximately RMB 359 million.
Comparable applications
New energy vehicle component factories; automotive assembly bases; automotive supplier industrial parks.

China reference 33 · Modern agriculture and new energy

Integrated Agriculture Livestock and Solar PV Technology Park

A planned technology park combining agriculture, livestock production and solar photovoltaics, with an integrated layout of production, farming and energy facilities.

Development approach
Phased development of an integrated agriculture, livestock and solar PV park.
Key facilities
Agricultural and livestock production facilities, solar PV systems and shared infrastructure.
Key site requirements
Coordination of agricultural land use, solar resource conditions and grid connection.
Planned investment and schedule
Total investment: RMB 2.8 billion. Phase I: 2 years. Phase II: 1 year.
Comparable applications
Integrated agriculture, livestock and solar parks; controlled-environment agriculture bases; energy projects supporting agriculture and livestock production.

China reference 34 · Advanced chemical materials

Organosilicon Product Manufacturing

Planned organosilicon production facilities and utilities for the manufacture of advanced chemical materials.

Development approach
New organosilicon material R&D and production facilities.
Key facilities
Intelligent workshops, warehouses, laboratory testing and office facilities.
Key site requirements
Approximately 50 mu of planned land; suitability for chemical material production, safety and environmental requirements.
Planned investment and schedule
Total investment: approximately RMB 150 million.
Comparable applications
Organosilicon factories; silicon-based material production bases; fine chemical industrial parks.

China reference 35 · Food processing and cold chain

White-Feather Broiler Processing and Cold Chain Facilities in North China

Planned facilities in Hebei for slaughtering 120 million white-feather broilers per year, with 60,000 tonnes of cold chain logistics capacity, integrating poultry processing and refrigerated storage.

Development approach
Phased development of slaughtering, processing and cold chain facilities.
Key facilities
Slaughtering and cutting facilities, cold storage and logistics infrastructure.
Key site requirements
Hebei; live poultry supply, food hygiene and cold chain transport.
Planned investment and schedule
Total investment: approximately RMB 901 million. Development period: 4 years and 9 months.
Comparable applications
Poultry slaughter and processing plants; meat production bases; supporting cold chain logistics projects.

China reference 36 · Hydrogen energy and chemicals

Hydrogen Liquefaction Demonstration Facility in North China

A planned demonstration facility in Hebei with hydrogen liquefaction capacity of 1 tonne per day, including liquefaction process equipment and production safety facilities.

Development approach
New hydrogen liquefaction demonstration plant.
Key facilities
Liquefaction equipment, storage and transport facilities, and safety systems.
Key site requirements
Hebei; verification of hydrogen supply, energy demand and safety separation distances.
Planned investment and schedule
Total investment: approximately RMB 98.5438 million. Construction period: 12 months.
Comparable applications
Hydrogen liquefaction plants; hydrogen demonstration facilities; industrial gas production bases.

China reference 37 · Cold chain logistics

Completion and Expansion of Cold Chain Bases in Central and East China

Two cold chain bases in Zhengzhou and Kunshan, with planned building areas of approximately 115,000 m² and 88,000 m² respectively, including existing buildings and subsequent construction.

Development approach
Completion and expansion of existing cold chain bases.
Key facilities
Cold stores, warehousing, logistics and distribution facilities.
Key site requirements
Zhengzhou and Kunshan; connectivity with transport hubs and food cold chain networks.
Planned investment and schedule
Combined acquisition and follow-on construction investment: approximately RMB 1.134 billion. Follow-on construction period: 3 years.
Comparable applications
Cold chain warehousing bases; cold store completion and conversion projects; food cold chain logistics parks.

China reference 38 · Building materials and resource recycling

Integrated Utilization of Coal Gangue

Planned coal gangue treatment and resource recovery facilities, linking feedstock preprocessing, recycled product manufacturing and environmental infrastructure.

Development approach
New integrated coal gangue utilization facilities.
Key facilities
Solid waste preprocessing, recycled product production and environmental facilities.
Key site requirements
Proximity to coal gangue sources; verification of transport and environmental conditions.
Planned investment and schedule
Total investment: RMB 80 million.
Comparable applications
Coal gangue utilization plants; building material production from solid waste; circular economy projects in mining areas.

China reference 39 · Environmental materials and water treatment

Membrane Material Production Base

Planned factory buildings and associated facilities for the manufacture of water treatment membrane products.

Development approach
New membrane material production buildings.
Key facilities
Membrane product manufacturing, warehousing and utilities.
Key site requirements
Clean production conditions, water supply and wastewater treatment.
Planned investment and schedule
Total investment: approximately RMB 185 million. Construction period: 16 months.
Comparable applications
Water treatment membrane factories; environmental membrane material production bases; water equipment industrial parks.

China reference 40 · Modern agriculture

Ecological Agriculture Park

A planned ecological agriculture park with production, exhibition and supporting facilities. This is presented as a park development case, rather than a standalone manufacturing factory.

Development approach
Phased development of an ecological agriculture park.
Key facilities
Agricultural production and exhibition facilities, with staff amenities.
Key site requirements
An urban agriculture area in Beijing; suitable agricultural land and market catchment.
Planned investment and schedule
Total investment: RMB 410 million. Expected overall construction period: 2.5 years.
Comparable applications
Modern agricultural parks; controlled-environment agriculture bases; parks supporting agricultural processing.

China reference 41 · Medical devices and biopharmaceuticals

Diagnostic Reagent and Consumable Production Facility Conversion in South China

Planned fit-out and conversion of consumable and extraction reagent production departments in Guangzhou, improving production areas and associated facilities.

Development approach
Fit-out and conversion of production departments within an existing factory site.
Key facilities
Consumable and extraction reagent production areas and cleanroom infrastructure.
Key site requirements
An existing site in Guangzhou; reagent production, cleanliness and fire safety requirements.
Planned investment and schedule
Total investment: approximately RMB 12.0739 million. Construction period: 8 months.
Comparable applications
Diagnostic reagent workshop conversions; medical consumable factories; biopharmaceutical production facility upgrades.

China reference 42 · Agricultural processing

Sichuan Pepper Processing Demonstration Project in Northwest China

A planned Sichuan pepper processing demonstration project in Shaanxi, with facilities for raw material treatment, processing and product storage and transport.

Development approach
Agricultural processing workshop conversion and equipment installation.
Key facilities
Sichuan pepper preprocessing, processing and warehousing facilities.
Key site requirements
A Sichuan pepper growing area in Shaanxi; raw material collection, seasonal processing and logistics.
Planned investment and schedule
Total investment: approximately RMB 6.2933 million. Construction period: 12 months.
Comparable applications
Sichuan pepper processing plants; specialty agricultural processing bases; seasoning production parks.

China reference 43 · Metal processing and environmental services

Metal Surface Treatment Industrial Park in Southwest China

A planned industrial park in Guizhou with centralized surface treatment factory buildings, wastewater and waste acid treatment, and steam and gas infrastructure.

Development approach
New metal surface treatment industrial park.
Key facilities
Surface treatment workshops, centralized environmental treatment facilities and utilities.
Key site requirements
Guizhou; coordinated environmental treatment and shared utility provision.
Planned investment and schedule
Total investment: RMB 1 billion. Construction period: 2 years.
Comparable applications
Metal surface treatment industrial parks; centralized electroplating zones; industrial wastewater infrastructure.

China reference 44 · Metal materials

Metal Materials Industrial Park

A planned metal material industrial park combining processing, warehousing and ancillary facilities, including five metal component production lines.

Development approach
New metal material industrial park and production lines.
Key facilities
Five metal component production lines, warehousing and environmental facilities.
Key site requirements
Steel supply, heavy goods transport, gas supply and wastewater treatment conditions.
Planned investment and schedule
Total investment: RMB 100 million. Construction period: 1.5 years.
Comparable applications
Metal material industrial parks; metal processing bases; standard factory buildings for advanced materials.

China reference 45 · Food processing and cold chain

Intelligent Food Processing and Cold Chain Industrial Park in Central China

A planned park in Hunan integrating cattle and sheep slaughtering and cutting, food processing, a central kitchen and cold storage. Phase I covers approximately 184.47 mu, with approximately 113,400 m² of buildings.

Development approach
Phased development of a food processing and cold chain industrial park.
Key facilities
Slaughtering and cutting facilities, a central kitchen, R&D and production facilities, and cold chain warehousing.
Key site requirements
Hunan; livestock supply, food safety and cold chain transport conditions.
Planned investment and schedule
Total investment: approximately RMB 500 million. Construction period: 8 months.
Comparable applications
Meat processing parks; central kitchen factories; intelligent cold chain industrial parks.

China reference 46 · Grain and edible oil processing

Soybean Oil Processing Plant in East China

A planned soybean oil processing plant in Shandong on approximately 55 mu, with approximately 56,700 m² of buildings for crushing, refining, bottling and storage. Planned annual output is 50,000 tonnes.

Development approach
New soybean oil processing plant.
Key facilities
Crushing, refining and bottling lines, warehouses and supporting facilities.
Key site requirements
Qingdao, Shandong; inbound soybean logistics and distribution of edible oil products.
Planned investment and schedule
Total investment: approximately RMB 225 million. Construction period: approximately 2 years.
Comparable applications
Soybean crushing plants; grain and edible oil refining bases; edible oil bottling factories.

China reference 47 · Textiles and apparel

Garment Production and Distribution Center in East China

A planned center in Qingdao, Shandong, with approximately 49,000 m² of buildings for garment production, inspection and distribution, together with underground facilities.

Development approach
New garment production, inspection and distribution center.
Key facilities
Production buildings, inspection and distribution facilities, and underground ancillary space.
Key site requirements
Qingdao, Shandong; coordination of garment production, inspection and distribution.
Planned investment and schedule
Total investment: RMB 120 million. Construction period: 2 years and 3 months.
Comparable applications
Garment production bases; finished garment inspection and distribution centers; textile industrial parks.

China reference 48 · Food manufacturing

Food Industrial Park in East China

A planned food industrial park in Ningbo, Zhejiang, on approximately 150 mu, with approximately 281,100 m² of buildings for factories, cold storage, food R&D, offices and staff accommodation.

Development approach
New food industrial park.
Key facilities
Factory buildings, cold storage, food R&D facilities, offices and staff accommodation.
Key site requirements
Ningbo, Zhejiang; food production, cold chain warehousing and urban distribution.
Planned investment and schedule
Total investment: approximately RMB 1.502 billion. Construction period: 1 year and 6 months.
Comparable applications
Food industrial parks; bakery and dairy production bases; food cold chain infrastructure.

China reference 49 · Plastic products

Intelligent Injection Molding in South China

A planned project in Jieyang, Guangdong, on approximately 15 mu, with approximately 15,000 m² of intelligent injection molding workshops and service facilities. Planned output is approximately 10,000 tonnes of plastic packaging boxes and containers per year.

Development approach
New intelligent injection molding factory buildings.
Key facilities
Injection molding workshops, surface processing and testing facilities, and environmental and fire safety infrastructure.
Key site requirements
Jieyang, Guangdong; plastic raw material transport, energy supply and environmental conditions.
Planned investment and schedule
Total investment: RMB 120 million. Construction period: 12 months.
Comparable applications
Intelligent injection molding factories; plastic packaging production bases; injection molding industrial parks.

Overseas Manufacturing and Investment References

These international feasibility references illustrate different local operating conditions. They do not establish that a China regulatory route or incentive applies overseas.

Overseas reference 01 · Aquaculture and food processing

Marine Aquaculture and Sea Cucumber Processing Base in East Africa

A planned marine aquaculture base in Djibouti on approximately 60 mu, with approximately 2,000 m² of Phase I buildings for a hatchery, sea cucumber processing, warehousing and staff amenities.

Development approach
New marine aquaculture and processing facilities.
Key facilities
Hatchery, sea cucumber processing plant, warehouses and dormitories.
Key site requirements
A bay aquaculture area in Djibouti; seawater quality, cultivation space and export logistics.
Planned investment and schedule
Total investment: USD 10 million. Phase I construction period: approximately 2 years.
Comparable applications
Marine aquaculture bases; sea cucumber processing plants; integrated aquatic hatchery and processing projects.

Overseas reference 02 · Aquaculture

Freshwater Aquaculture and Hatchery Base in Southeast Asia

A planned aquaculture base in Myanmar on approximately 236.2 mu, with fishponds, spawning and hatchery workshops, inspection facilities and staff amenities.

Development approach
New freshwater fish farming base.
Key facilities
Fishponds, spawning and hatchery workshops, inspection facilities and dormitories.
Key site requirements
Myanmar; freshwater availability, water quality and suitable aquaculture land.
Planned investment and schedule
Total investment: RMB 7 million. Construction period: approximately 6 months.
Comparable applications
Freshwater fish farming bases; fish hatcheries; supporting aquaculture facilities.

Overseas reference 03 · Aquaculture

Reservoir Aquaculture Base in Southeast Asia

A planned reservoir aquaculture base in Laos, with production facilities for fish farming, temporary holding and transport.

Development approach
New reservoir aquaculture base.
Key facilities
Farming, temporary holding and associated transport facilities.
Key site requirements
A reservoir aquaculture area in Laos; water conditions, transport access and ecological requirements.
Planned investment and schedule
Construction period: approximately 1 year. The investment amount is not shown because figures in the report are inconsistent.
Comparable applications
Reservoir aquaculture bases; supporting aquaculture facilities; fishery production bases.

Overseas reference 04 · Advanced materials and metal products

Wear-Resistant Material Production Base in Central Asia

A planned base in Uzbekistan producing 50,000 tonnes of wear-resistant steel balls per year, on approximately 30 mu with approximately 5,000 m² of factory space, including ball-rolling lines, offices and warehousing.

Development approach
New wear-resistant material production base within an industrial park.
Key facilities
Steel ball rolling lines, factory buildings, warehouses and offices.
Key site requirements
An industrial park in Tashkent Region, Uzbekistan; cross-border steel transport and water and power supplies.
Planned investment and schedule
Total investment: approximately RMB 37.2260 million. Construction period: 14 months.
Comparable applications
Wear-resistant mining material factories; mining consumable production bases; overseas metal product factories.

Overseas reference 05 · Prefabricated building materials and home products

Modular Bathroom Production Base in the Middle East

A planned production base in leased factory premises in Saudi Arabia for sheet molding compound (SMC) modular bathrooms, with approximately 9,848 m² of total floor area and capacity for 28,000 sets per year.

Development approach
Lease of factory premises and installation of modular bathroom production lines.
Key facilities
Production and testing buildings, offices and staff amenities.
Key site requirements
Riyadh, Saudi Arabia; factory leasing, local installation and finished goods distribution.
Planned investment and schedule
Total investment: RMB 35 million. Construction period: approximately 8–10 months.
Comparable applications
Overseas modular bathroom factories; prefabricated bathroom production bases; SMC composite product factories.

Overseas reference 06 · Environmental materials and water treatment

Reverse Osmosis Membrane Production Base in North Africa

A planned seawater desalination reverse osmosis membrane base near Ain Sokhna Port in eastern Egypt. Phase I covers approximately 14,425 m² of land and 25,753 m² of buildings. Membrane element winding lines are planned first, followed by membrane sheet production lines. Long-term membrane sheet capacity is approximately 5 million m² per year.

Development approach
A new Sino-Egyptian project company, with phased investment in factory buildings and production lines.
Key facilities
Membrane element and sheet workshops; high- and low-pressure testing systems; wastewater treatment and solvent recovery rooms; an intermediate warehouse; and utility equipment rooms.
Key site requirements
A preliminary site west of the Ain Sokhna desalination plant; coordinated port logistics, desalination membrane market access, energy supply, wastewater treatment and solvent management.
Planned investment and schedule
Feasibility estimate of total investment: approximately USD 118.8997 million. Phased construction; the subsequent membrane sheet production line has a planned construction period of 3 years.
Comparable applications
Overseas desalination membrane factories; reverse osmosis membrane element bases; localized membrane manufacturing; overseas investment in water treatment materials.

How factory consulting becomes a usable decision

Engagement scope is agreed for the actual project. Our early-stage consulting can connect the following workstreams; specialist implementation is separately defined with appropriate providers.

WorkstreamWhat is examinedDecision material
Investment screeningMarket demand, product specification, location constraints and investment options.Opportunity screening and ranked options.
Feasibility studyMarket, process, facility, CAPEX, OPEX, cash flow and risk assessment.Feasibility report and investment assumptions.
Site and facility reviewProduction needs, land or lease options, utilities and unresolved site conditions.Site comparison and evidence register.
Equipment definitionProcess capacity, technical requirements and acceptance criteria.User requirements specification and quotation comparison.
Implementation planningResponsibilities, dependencies, approval questions and review milestones.Delivery roadmap and action register.
Specialist coordinationDetailed design, inspection, procurement or installation when expressly included.Defined partner responsibilities and contract-specific deliverables.

Discuss your China manufacturing plan

Tell us whether you plan to set up a factory, select a site, find a contract manufacturer or source suppliers. Yipu Consulting will review your requirements and contact you by email.

Add product and investment details (optional)

We use your details to respond to your inquiry. Privacy information. You can also email fr@yipuzixun.com.